SENATE BILL No. 1488

 

 

September 14, 2010, Introduced by Senator BIRKHOLZ and referred to the Committee on Natural Resources and Environmental Affairs.

 

 

 

     A bill to amend 1994 PA 451, entitled

 

"Natural resources and environmental protection act,"

 

by amending section 32607 (MCL 324.32607), as amended by 2004 PA

 

546.

 

THE PEOPLE OF THE STATE OF MICHIGAN ENACT:

 

     Sec. 32607. (1) The department shall not authorize the same

 

bottomland log removal area in more than 1 submerged log removal

 

permit at any 1 time.

 

     (2) The department may modify the boundaries of a proposed

 

bottomland log removal area in a submerged log removal permit to

 

avoid overlaps with other active submerged log removal permits or

 

adverse impacts, including, but not limited to, impacts to the

 

environment, natural resources, riparian rights, and the public


 

trust.

 

     (3) A submerged log removal plan approved by the department

 

shall be included in each submerged log removal permit.

 

     (4) A submerged log removal permit shall contain terms and

 

conditions that are determined by the department to protect the

 

environment, natural resources, riparian rights, and the public

 

trust.

 

     (5) Each submerged log removal permit shall expire on January

 

1, 2013 upon the expiration of the required permit issued by the

 

United States army corps of engineers. An applicant shall notify

 

the department of the date on which the federal government United

 

States army corps of engineers issued its approval for the

 

submerged log removal permit. Processing fees received under this

 

subsection shall be forwarded to the state treasurer for deposit

 

into the fund.

 

     (6) A submerged log removal permit issued under this section

 

is not transferrable unless approved in writing by the department.

 

     (7) An applicant for a submerged log removal permit shall

 

provide a performance bond acceptable to the department in the

 

amount of $100,000.00. The performance bond shall be provided to

 

the department at least 10 days prior to beginning submerged log

 

removal in a bottomland log removal area. The performance bond

 

shall ensure compliance with the submerged log removal permit for

 

the period of the permit or until the authorized submerged log

 

removal is completed to the satisfaction of the department and all

 

payments under section 32609 have been made. The department shall

 

issue a written statement releasing the permittee and bonding


 

company upon termination of the submerged log removal permit and

 

upon satisfaction of the department as to the compliance of the

 

permittee with the terms and conditions of the permit. The

 

department may draw upon the performance bond for delinquent

 

payments as required in section 32609.

 

     (8) A permittee may request, in writing, and the department

 

may grant, termination of a submerged log removal permit prior to

 

the expiration date, including release from quarterly reports and

 

performance bond requirements.